High level surface water compliance assessment of the Brakpan/Withok tailings complex

High level surface water compliance assessment of the Brakpan/Withok tailings complex

Project description

Calliper was appointed to provide engineering input to the high-level assessment of the Brakpan/Withok tailings complex of DRD Gold. The scope included the review of available design or as-built drawings, visual assessment of site infrastructure with reference to available drawings, compilation of a report with findings and recommendations. Calliper also provided costs for engineering works required to achieve the stormwater management plan.

Project objectives

  • To determine surface water compliance
  • To determine stability and overall safety of the tailings complex and associated infrastructure

Project Details

CONSTRUCTION PERIOD

1 month

CLIENT

Highlands Hydrology

PROJECT TYPE
PROJECT LOCATION

Brakpan/Withok

SERVICES RENDERED
  • Civil Design and Engineering
  • Project Management
  • Architectural Services
  • Environmental Management Services

Project Gallery